Construction Construction Update: the Foundation Pour March 3, 2021March 3, 2021 Mike Malcom Chris Shook and Nabholz’s team clocked in at 2:00 a.m. to prepare the site for today’s concrete pour. Twenty-one concrete trucks delivered load after load as the team pumped concrete into the site of the church’s new building. default